BJS Bars Move
Posted: 10 Jun 2013 6:41 am
Deborah and I moved to a new residence in late March. With this move, BJS Bars has relocated which has required the building of a new shop. We are currently about 75% finished with the shop. It is finally in the dry, and we are wiring and doing finish work inside. With all the rain, the grounds have been a real mess and it took longer than expected to reach this point.
Please be aware that bar availability is very low, with many items being out of stock. I will keep the website updated. With luck, the shop should be finished in 4 to 6 weeks and I will begin to build bars again, as soon as possible.
Thanks for your patience during this transition. It was a necessary and positive move.
Butch
Please be aware that bar availability is very low, with many items being out of stock. I will keep the website updated. With luck, the shop should be finished in 4 to 6 weeks and I will begin to build bars again, as soon as possible.
Thanks for your patience during this transition. It was a necessary and positive move.
Butch